CR 126 over PATSILIGA CREEK TRIB

3 MI NW OF REYNOLDS · County 269, Georgia · Built 1950 · 2 Lanes · 158 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000026950180
Year Built
1950
Reconstructed
1989
Length
10.4 m (34.1 ft)
Max Span
5.8 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
158
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$133,000
Total Project Cost
$199,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.