US 280 over THOMAS CREEK

4 MI NE OF REIDSVILLE · County 267, Georgia · Built 2000 · 2 Lanes · 3,910 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000026750320
Year Built
2000
Length
48.8 m (160.1 ft)
Max Span
12.2 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
3,910
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$625,000
Total Project Cost
$938,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.