SR 121 over ALTAMAHA RIV OVERFLOW

9.7 MI SW OF GLENNVILLE · County 267, Georgia · Built 1988 · 2 Lanes · 3,990 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000026700470
Year Built
1988
Length
145.1 m (476 ft)
Max Span
10.4 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
3,990
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,860,000
Total Project Cost
$2,790,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.