SR 22 over SOUTH FORK OGEECHEE RIV

2.6 MI S OF CRAWFORDVILLE · County 265, Georgia · Built 2006 · 2 Lanes · 540 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000026550310
Year Built
2006
Length
57.9 m (190 ft)
Max Span
33.5 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
540
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$742,000
Total Project Cost
$1,114,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.