US 80 (WBL) over SOUTH FORK UPATOI CREEK

3.6 MI WSW OF GENEVA · County 263, Georgia · Built 2001 · 2 Lanes · 3,150 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000026350710
Year Built
2001
Length
54.9 m (180.1 ft)
Max Span
27.4 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
3,150
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$703,000
Total Project Cost
$1,055,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.