SR 30 over FLINT RIVER

7.5 MI E OF LESLIE · County 261, Georgia · Built 2019 · 2 Lanes · 6,030 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000026150620
Year Built
2019
Length
684 m (2244.1 ft)
Max Span
16.8 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
6,030
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$199,282,000
Total Project Cost
$298,923,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.