US 27 (SBL) over DOT R/R (ABANDONED)

0.25 MI NW OF LUMPKIN · County 259, Georgia · Built 2000 · 2 Lanes · 2,080 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000025950400
Year Built
2000
Length
54.9 m (180.1 ft)
Max Span
19.8 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
2,080
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$703,000
Total Project Cost
$1,055,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.