CURRAHEE LANE over NORTH FORK BROAD RIVER

3.2 MI SW OF TOCCOA · County 257, Georgia · Built 2018 · 2 Lanes · 730 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000025750630
Year Built
2018
Length
33.5 m (109.9 ft)
Max Span
33.5 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
730
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$9,768,000
Total Project Cost
$14,652,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.