WILDWOOD ROAD over BEAR CREEK
7 MI NW OF GRIFFIN · County 255, Georgia · Built 2023 · 2 Lanes · 519 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
33.352361, -84.359458
This bridge is in worse condition than 24.1% of bridges in County 255. The average bridge in Georgia is 0 years old; this one is 3 years old.
Nearby Bridges
LOWER WOOLSEY RD over BEAR CREEK TRIB
Built 2004
MUD BRIDGE ROAD over FLINT RIVER TRIB
Built 1956
MOORE ROAD over FLINT RIVER TRIB
Built 1956
HAMPTON ROAD over FLINT RIVER
Built 1974
STELLE ROAD over BEAR CREEK TRIB
Built 1956
BIRDIE ROAD over GRIFFIN RESERVOIR TRIB
Built 1954
LOWER WOOLSEY ROAD over BEAR CREEK
Built 2005
HAMPTON ROAD over WOOLSEY CREEK
Built 2003
MANLEY ROAD over HEADS CREEK TRIB
Built 1956
SR 92 over FLINT RIVER
Built 2014
Bridge Details
- Structure #
- 000000025550720
- Year Built
- 2023
- Length
- 36.6 m (120.1 ft)
- Max Span
- 12.2 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 519
- Material
- Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $10,656,000
- Total Project Cost
- $15,984,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.