OGEECHEE ROAD over OGEECHEE CREEK

2.5 MILES SW OF SYLVANIA · County 251, Georgia · Built 2022 · 2 Lanes · 760 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000025150330
Year Built
2022
Length
56.4 m (185 ft)
Max Span
22.9 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
760
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$16,428,000
Total Project Cost
$24,642,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.