SR 21 (SBL) over GEORGIA MIDLANDS RR

6.4 MILES SE OF SYLVANIA · County 251, Georgia · Built 2003 · 2 Lanes · 20,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000025150250
Year Built
2003
Length
65.8 m (215.9 ft)
Max Span
21.9 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
20,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$844,000
Total Project Cost
$1,266,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.