SR 24 over OGEECHEE RIVER OVERFLOW

1.5 MI S OF OLIVER · County 251, Georgia · Built 1964 · 2 Lanes · 2,290 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000025100150
Year Built
1964
Length
170.7 m (560 ft)
Max Span
12.2 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
2,290
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,188,000
Total Project Cost
$3,282,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.