SR 3 US 19 over GSWRR

3 MILES SOUTH OF ELLAVILL · County 249, Georgia · Built 2009 · 2 Lanes · 3,840 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000024950150
Year Built
2009
Length
64.3 m (211 ft)
Max Span
21.9 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
3,840
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.