US 27/ SR 1 over CSX RAILROAD

2.2 MI S OF CUTHBERT · County 243, Georgia · Built 2015 · 2 Lanes · 25,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000024350360
Year Built
2015
Length
55.5 m (182.1 ft)
Max Span
21.3 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
25,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$16,161,000
Total Project Cost
$24,242,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.