CR 152 over PACHITLA CREEK

3 MI NE OF CUTHBERT · County 243, Georgia · Built 1966 · 2 Lanes · 420 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000024350180
Year Built
1966
Length
39 m (128 ft)
Max Span
9.8 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
420
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$500,000
Total Project Cost
$750,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.