CR 3 over L. ICHAWAYNOCHAWAY CREEK

3.8 MI NW OF SHELLMAN · County 243, Georgia · Built 1980 · 2 Lanes · 158 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000024350020
Year Built
1980
Reconstructed
2002
Length
30.5 m (100.1 ft)
Max Span
6.1 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
158
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$391,000
Total Project Cost
$586,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.