LOW GAP ROAD over TALLULAH RIVER

6.6MI SW OF TIGER · County 241, Georgia · Built 2007 · 2 Lanes · 1,061 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000024150800
Year Built
2007
Length
76.2 m (250 ft)
Max Span
19.2 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,061
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$977,000
Total Project Cost
$1,465,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.