JOY BRIDGE ROAD over TALLULAH RIVER

5.2 MI OF TIGER · County 241, Georgia · Built 2006 · 1 Lanes · 323 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000024150780
Year Built
2006
Length
35.1 m (115.2 ft)
Max Span
17.7 m
Width
5.3 m (17.4 ft)
Lanes
1
Daily Traffic
323
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$327,000
Total Project Cost
$490,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.