SHADYSIDE DRIVE over SCOTT CREEK

IN W CLAYTON · County 241, Georgia · Built 1968 · 2 Lanes · 280 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
6
Satisfactory
Superstructure
4
Poor
Substructure
7
Good

Bridge Details

Structure #
000000024150430
Year Built
1968
Length
9.8 m (32.2 ft)
Max Span
9.8 m
Width
6.6 m (21.7 ft)
Lanes
2
Daily Traffic
280
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$125,000
Total Project Cost
$188,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.