CR 153 over TIGER CREEK

3.1 MI S OF TIGER · County 241, Georgia · Built 1932 · 2 Lanes · 323 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000024150270
Year Built
1932
Length
27.4 m (89.9 ft)
Max Span
9.1 m
Width
6.4 m (21 ft)
Lanes
2
Daily Traffic
323
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$352,000
Total Project Cost
$527,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.