WOODS ROAD over SHE CREEK

4.4 MI SE OF CLAYTON · County 241, Georgia · Built 1989 · 1 Lanes · 126 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000024150230
Year Built
1989
Length
7.9 m (25.9 ft)
Max Span
7.9 m
Width
5.2 m (17.1 ft)
Lanes
1
Daily Traffic
126
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$74,000
Total Project Cost
$111,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.