TALLULAH ROAD over TALLULAH RIVER

7.7 MI W OF CLAYTON · County 241, Georgia · Built 1980 · 2 Lanes · 323 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000024150170
Year Built
1980
Length
54.9 m (180.1 ft)
Max Span
12.2 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
323
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$703,000
Total Project Cost
$1,055,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.