BEAVERDAM ROAD over BEAVERDAM CREEK

8 MI W OF EATONTON · County 237, Georgia · Built 1992 · 2 Lanes · 350 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000023750070
Year Built
1992
Length
10.4 m (34.1 ft)
Max Span
3 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
350
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$133,000
Total Project Cost
$199,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.