SR 230 over MOSQUITO CREEK

8.5 MI SE OF HAWKINSVILLE · County 235, Georgia · Built 1992 · 2 Lanes · 320 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000023500340
Year Built
1992
Length
41.5 m (136.2 ft)
Max Span
10.4 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
320
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.