SR 257 over CEDAR CREEK

5 MI SW OF HAWKINSVILLE · County 235, Georgia · Built 1955 · 2 Lanes · 1,520 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000023500230
Year Built
1955
Length
73.2 m (240.2 ft)
Max Span
12.2 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
1,520
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$207,000
Total Project Cost
$563,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.