CAVES SPRING ROAD over CEDAR CREEK TRIB

IN NW CEDARTOWN · County 233, Georgia · Built 1996 · 2 Lanes · 2,450 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000023350630
Year Built
1996
Length
27.4 m (89.9 ft)
Max Span
9.1 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
2,450
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$352,000
Total Project Cost
$527,000