HUTCHINGS MOUNTAIN over THOMPSON CR-SILVER COMET

IN SOUTH ROCKMART · County 233, Georgia · Built 1965 · 2 Lanes · 323 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000023350240
Year Built
1965
Length
17.1 m (56.1 ft)
Max Span
8.5 m
Width
6.5 m (21.3 ft)
Lanes
2
Daily Traffic
323
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$219,000
Total Project Cost
$328,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.