SR 6 - US 278 over ESOM SLOUGH TRIB.

7.7 MI SW OF CEDARTOWN · County 233, Georgia · Built 1931 · 2 Lanes · 2,520 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000023300070
Year Built
1931
Reconstructed
1938
Length
9.8 m (32.2 ft)
Max Span
3 m
Lanes
2
Daily Traffic
2,520
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$125,000
Total Project Cost
$188,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.