SR 362 over FLINT RIVER OVERFLOW

7 MI NW OF CONCORD · County 231, Georgia · Built 1960 · 2 Lanes · 2,490 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000023100090
Year Built
1960
Length
48.8 m (160.1 ft)
Max Span
12.2 m
Width
9.9 m (32.5 ft)
Lanes
2
Daily Traffic
2,490
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$625,000
Total Project Cost
$938,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.