SR 53 over LONG SWAMP CREEK

3 MI NE OF TATE · County 227, Georgia · Built 1929 · 2 Lanes · 7,830 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000022700140
Year Built
1929
Reconstructed
1980
Length
45.7 m (149.9 ft)
Max Span
9.1 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
7,830
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$586,000
Total Project Cost
$879,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.