SR 92 over LICK LOG CREEK

2.6 MI S OF HIRAM · County 223, Georgia · Built 1996 · 6 Lanes · 7,810 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000022300420
Year Built
1996
Reconstructed
2022
Length
61 m (200.1 ft)
Max Span
21.3 m
Width
32 m (105 ft)
Lanes
6
Daily Traffic
7,810
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$781,000
Total Project Cost
$1,172,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.