SR 22 over LONG CREEK OVERFLOW

3.1 MI S OF LEXINGTON · County 221, Georgia · Built 2004 · 2 Lanes · 1,210 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000022150330
Year Built
2004
Length
9.8 m (32.2 ft)
Max Span
3 m
Lanes
2
Daily Traffic
1,210
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$125,000
Total Project Cost
$188,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.