OCONEE CONNECTOR over SR 10 LOOP

3.5 MI E OF EASTVILLE · County 219, Georgia · Built 2011 · 5 Lanes · 11,256 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000021950460
Year Built
2011
Length
76.2 m (250 ft)
Max Span
25.9 m
Width
28.8 m (94.5 ft)
Lanes
5
Daily Traffic
11,256
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,776,000
Total Project Cost
$2,664,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.