TABOR ROAD over YELLOW RIVER

3 MI W OF OXFORD · County 217, Georgia · Built 1985 · 2 Lanes · 1,594 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000021750080
Year Built
1985
Reconstructed
2013
Length
73.2 m (240.2 ft)
Max Span
24.4 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
1,594
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$938,000
Total Project Cost
$1,407,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.