SR 212 over YELLOW RIVER

6.5 MI S OF PORTERDALE · County 217, Georgia · Built 1972 · 2 Lanes · 4,960 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000021700200
Year Built
1972
Length
140.2 m (460 ft)
Max Span
21.3 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
4,960
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,797,000
Total Project Cost
$2,696,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.