SR 81 over YELLOW RIVER

IN PORTERDALE · County 217, Georgia · Built 1943 · 2 Lanes · 10,100 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000021700120
Year Built
1943
Length
95.1 m (312 ft)
Max Span
11.9 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
10,100
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,219,000
Total Project Cost
$1,829,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.