SR 85 over NS RR & RR STREET

WEST CENTRAL COLUMBUS · County 215, Georgia · Built 1997 · 4 Lanes · 13,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000021550510
Year Built
1997
Length
274.3 m (899.9 ft)
Max Span
27.4 m
Width
20.2 m (66.3 ft)
Lanes
4
Daily Traffic
13,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,435,000
Total Project Cost
$8,152,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.