MUTEC DRIVE over BULL CREEK

EAST COLUMBUS · County 215, Georgia · Built 1986 · 4 Lanes · 1,370 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000021550470
Year Built
1986
Reconstructed
2013
Length
48.8 m (160.1 ft)
Max Span
12.2 m
Width
21.2 m (69.6 ft)
Lanes
4
Daily Traffic
1,370
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$625,000
Total Project Cost
$938,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.