HUBBARD ROAD over HEIFERHORN CREEK

NORTH COLUMBUS · County 215, Georgia · Built 1938 · 2 Lanes · 480 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
000000021500880
Year Built
1938
Length
39.6 m (129.9 ft)
Max Span
12.2 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
480
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$508,000
Total Project Cost
$762,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.