I-185 over SR 85(US 27 ALT)(EXIT 7)

SR 85- CENTRAL COLUMBUS · County 215, Georgia · Built 1969 · 8 Lanes · 68,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000021500670
Year Built
1969
Reconstructed
1989
Length
47.2 m (154.9 ft)
Max Span
24.1 m
Width
49.3 m (161.7 ft)
Lanes
8
Daily Traffic
68,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,597,000
Total Project Cost
$2,395,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.