AIRPORT ROAD over CONASAUGA RIVER

MURRAY-WHITFIELD CO LINE · County 213, Georgia · Built 1975 · 2 Lanes · 3,730 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000021300380
Year Built
1975
Length
128 m (419.9 ft)
Max Span
21.3 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
3,730
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,641,000
Total Project Cost
$2,462,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.