SR 83 over I-20

3 MI SW OF MADISON · County 211, Georgia · Built 2003 · 3 Lanes · 6,380 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000021150630
Year Built
2003
Length
63.7 m (209 ft)
Max Span
31.7 m
Width
21.5 m (70.5 ft)
Lanes
3
Daily Traffic
6,380
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,039,000
Total Project Cost
$1,559,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.