I-20 WBL over OCONEE RIVER OVERFLOW

5.6 MI SE OF BUCKHEAD · County 211, Georgia · Built 1968 · 2 Lanes · 137,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000021100360
Year Built
1968
Length
85.3 m (279.9 ft)
Max Span
12.2 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
137,000
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,094,000
Total Project Cost
$1,641,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.