I-20 WBL over CR 214- NORTH SUGAR CRK

1.9 MI SW OF BUCKHEAD · County 211, Georgia · Built 1968 · 2 Lanes · 92,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000021100330
Year Built
1968
Length
58.8 m (192.9 ft)
Max Span
12.2 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
92,200
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$754,000
Total Project Cost
$1,131,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.