SR 30 - US 280 over OCONEE RIVER OVERFLOW

1 MI W OF MT VERNON · County 209, Georgia · Built 2013 · 2 Lanes · 4,560 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000020950250
Year Built
2013
Length
97.5 m (319.9 ft)
Max Span
12.2 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
4,560
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$28,416,000
Total Project Cost
$42,624,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.