TAYLOR SPRINGS RD over TIGER CREEK
6.5 MI SE OF TARRYTOWN · County 209, Georgia · Built 1970 · 2 Lanes · 120 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
32.315, -82.448608
This bridge is in worse condition than 92.9% of bridges in County 209. The average bridge in Georgia is 0 years old; this one is 56 years old.
Nearby Bridges
KIBBEE ROAD over CAMP BRANCH
Built 1970
KIBBEE ROAD over NAKED CREEK
Built 1970
THOMPSON POND ROAD over TIGER CREEK
Built 2006
SR 297 over TIGER CREEK
Built 1979
KIBBEE ROAD over TIGER CREEK
Built 2007
SR 297 over PENDLETON CREEK
Built 1979
TAYLOR SPRINGS RD over SWIFT CREEK TRIB
Built 1970
NEW NORMANTOWN RD over TIGER CREEK
Built 1962
SR 297 over LONG CREEK
Built 1974
McDONALD ROAD over SWIFT CREEK
Built 1979
Bridge Details
- Structure #
- 000000020950050
- Year Built
- 1970
- Reconstructed
- 2001
- Length
- 67.1 m (220.1 ft)
- Max Span
- 6.1 m
- Width
- 7.7 m (25.3 ft)
- Lanes
- 2
- Daily Traffic
- 120
- Material
- Prestressed Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $860,000
- Total Project Cost
- $1,289,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.