I-75 over LITTLE TOWALIGA RIVER

7.5 MI N OF FORSYTH · County 207, Georgia · Built 1966 · 6 Lanes · 90,200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000020700510
Year Built
1966
Reconstructed
1986
Length
72.2 m (236.9 ft)
Max Span
28.3 m
Width
42.2 m (138.5 ft)
Lanes
6
Daily Traffic
90,200
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,936,000
Total Project Cost
$2,904,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.