SR 93 over SPENCE MILL CREEK

5 MILES SOUTH OF PELHAM · County 205, Georgia · Built 2004 · 2 Lanes · 1,050 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000020550900
Year Built
2004
Length
45.7 m (149.9 ft)
Max Span
9.1 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
1,050
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$586,000
Total Project Cost
$879,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.