MT. OLIVE ROAD over BIG SLOUGH

APP 8.5 MI W OF PELHAM · County 205, Georgia · Built 1965 · 2 Lanes · 170 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000020550700
Year Built
1965
Reconstructed
2002
Length
45.7 m (149.9 ft)
Max Span
4.6 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
170
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$586,000
Total Project Cost
$879,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.