US 19- SR 300 SBL over BIG SLOUGH

APP .5 MI N OF CAMILLA · County 205, Georgia · Built 1961 · 2 Lanes · 11,780 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000020500510
Year Built
1961
Length
31.1 m (102 ft)
Max Span
10.4 m
Width
11.2 m (36.7 ft)
Lanes
2
Daily Traffic
11,780
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$399,000
Total Project Cost
$598,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.